PITT DOCK MARINA REPLACEMENT
SHORELINE SUBSTANTIAL DEVELOPMENT REVISION | PL-SDP-24-0001
The applicant has proposed revisions to the Shoreline Substantial Development permit issued on February 27, 2024. The revisions consist of adding to the scope of the project to include the removal of 4 existing creosote pilings from the pier and the installation of 4 new 12’ steel pier pilings, 2 additional 12” piling will be installed on the floats, and a portion of the pier section will be re-decked with 100% grating.