PLEASURE CRAFT MARINA REPLACEMENT | PL-SDP-22-0006, PL-SCUP-22-0001, PL-SEPA-22-0018
The project proposal includes the replacement and re-design of the existing marina within the existing footprint. The proposal consists of the removal of 47,340 square feet of overwater coverage consisting of covered moorage, a solid decked ramp, and solid decked floats: including the removal of (33) 14” wood pilings.
The proposed project will install 10,661 square feet of overwater coverage, with 100% fiberglass grated ramp and 50% grated floats including the installation of (30) 10” galvanized steel pilings.
The existing office building will be relocated from the lower shore zone to the deeper shore zone and include the addition of a second floor “Harbormaster Suite” and a first-floor office and storage. A total reduction of 36,680 square feet is proposed as the covered moorage will be fully removed.